EXPERIENCE
CKA LLC.
Sterling Va.
November 2012 – March 2015
System Engineer
Change manager;
manager for 12 Data center rooms having equipment hoteling:
· Facilities Management
· Space assignment
· Documentation
· Power requirements
· Configuration Management
Communication
Science Corporation (CSC),
Fairfax VA. March,
2009 – February, 2012
IT Engineer
· Evaluated IT contracts for pricing and technical accuracy
· Wrote Statements of Work and Rough Orders of Magnitude
· Monitored IT projects from design through construction,
Transition and Tenant occupancy
· Interfaced with the customer from design through move in
· Systems involved include Outside Plant, Data,
Voice/ISDN/VoIP, secure Data and Voice, CCTV CATV alarms/IDS, Fire Alarm and
Building Automation
· Suggested modifications of the Pentagon Facilities
Performance Requirements that were used in construction Statements of Work
· Assisted with the close out of the ITS Pentagon Renovation
Program
· Develop Configuration Management programs
· Worked with all relevant codes, NEC, TIA/EIA, BICSI,
Pentagon regulations and TEMPEST.
· Managed 4 large projects inside and outside of the
Pentagon for PENREN and numerous small projects.
SMS Data Products
Group, Inc.
Sterling Va.
February, 2006 – March, 2009
IT Engineer
· Evaluated IT contracts for pricing and technical accuracy
· Wrote Statements of Work and Rough Orders of Magnitude
· Oversee IT projects from design through construction,
Transition and Tenant occupancy
· Interfaced with the customer from design through move in
· Systems involved include Outside Plant, Data,
Voice/ISDN/VoIP, secure Data and Voice, CCTV CATV alarms/IDS, Fire Alarm and
Building Automation
· Administer the Pentagon Outside Plant system for the
Pentagon
· Develop Configuration Management programs
· Work with all relevant codes, NEC, TIA/EIA, BICSI,
Pentagon regulations and TEMPEST.
Electronic Security
Services Inc.
Upper Marlboro Md.
March, 2005 – February, 2006
Project Manager
·Designed, installed, tested, marketed and managed the
following security related equipment for commercial buildings; Door Access
Systems, various security systems, IDS CCTV projects, CCTV, ESS and alarm
transmission design over Landline, Fiber Optic, Wireless and Ethernet and
Alarms design and installation.
·Performed over-all project management, engineering and
sales for a large number of contracts on the George Washington University
Campus, covering about 80% of the buildings on 2 campuses.
Old Bay
Construction, General Contractor (small family owned business)
Waldorf Md.
September, September, 2003 – March, 2005
Project Manager
·Managed a variety of jobs including building home
additions, handyman work, projects surveying, developed cost sheets, managed
subcontractors, met with inspectors and obtained permits.
·Worked part-time as an Electrical contractor with West
River Electric, working on commercial and residential electrical installation,
including the Installation of a Power Distribution Unit.
Electronic Security
Services Inc.
Upper Marlboro Md.
January, 2000 – September, 2003
Project Manager
·Design, install, test, market and manage the following
security related equipment for commercial buildings; Door Access Systems,
various security systems, CCTV projects, CCTV and alarm transmission design
over Landline, Fiber Optic, Wireless and Ethernet and Alarms design and
installation.
·Performed over-all project management, engineering and
sales for a large number of contracts on the George Washington University
Campus, covering about 80% of the buildings covering 2 campuses.
Zapata Electric
Waldorf Md.
October, 1999 – January, 2000
Electrician
·As an Electrician at Zapata, assisted with installation of
100kv generator and Automatic Transfer Switch
·Rewired new Emergency Panel and conducted various conduit
and wire runs during remodeling.
Bell Atlantic
Telephone Company,
Waldorf Md.
February, 1968- September, 1999
Cable Splicing
Technician
·During 31+ years with Chesapeake Telephone Co. /Bell
Atlantic, Mike held a variety of positions, Construction Splicer, Maintenance
Splicing Technician, Services Technician, Lineman, and
Frame Attendant.
·For in-depth telephone experience; see attached.
US ARMY,
Camp Casey, Korea,
September, 1969 – August, 1971
Field Cable Man
·Served 2 years as a Field Cable Man (36C) with the US Army
in Fort Bragg and Korea, supplying tactical cable and wire for the respective
units. Separated from the Army as a Sergeant E5. Served about 3 months as a
Platoon Sergeant, managing a field cabling platoon.
EDUCATION AND
TRAINING:
· Bell Atlantic Courses, 1968-1999
o
Installation
1 & 2
o
Schematic-Drawing
Reading
o
Splicing
School
o
Cable College
o
Fault
Locating School
o
DS1 High
Capacity School (Digital Subscriber 1)
o
T1 carrier
o
SLC 96
(Subscriber Line Carrier) and Series 5 School
o
Lite Span
2000 School
o
Bell Atlantic
Customer Relations, 24 Hours
· Other Training, 2000-Present
o
Pentagon
Confined space training
o
Air Blown
Fiber Engineering Course
o
DAVAR Cable
Identification System Qualification Class
o
PMI Project
Management Certification Test Preparation Class, 24 PMI Credits
o
30 hour OSHA
Safety certificate
o
Introduction
to Management/Engineering, Charles County Community College
REFERENCES: available upon
request.